The Tune My Space Approach

Investigate, Test, Define and Verify—Before the Problem Comes Back

The process is designed to prevent hidden moisture, hidden mold, HVAC involvement and incomplete contractor scopes from being overlooked before thousands are spent on cleanup.

01

Define the Question

Start with what remains unknown—not a preset test package.

Rob reviews the water history, odors, visible growth, health-related concerns, previous testing, contractor proposals and the decision the client needs to make.

02

Investigate the Building

Spend the time needed to understand the source and likely extent.

More than 20 years of building experience informs the evaluation of roofing, drainage, plumbing, wall and floor assemblies, crawlspaces, attics, basements and repairs.

03

Evaluate HVAC and Air Pathways

Look beyond the room where growth was first seen.

Condensate, coils, filtration, return pathways, supply pathways and pressure relationships are considered when evidence suggests broader distribution.

04

Test With a Purpose

Use air, surface or dust testing to answer what visual inspection cannot.

Every sample should support a defined question: identity, comparison, distribution, hidden concern, broader settled material or verification.

05

Define the Right Work

Connect the source, affected materials, laboratory evidence and project sequence.

The report distinguishes confirmed findings, likely conditions and remaining uncertainty, then defines source correction, remediation and reconstruction priorities.

06

Verify Independently

Do not let the contractor be the only party declaring the job complete.

Tune My Space can return before reconstruction to review the scope, moisture, cleanliness and appropriate clearance testing.

Tune My Space

The investigation is the paid professional service.

  • Time to understand the building
  • Testing selected around unanswered questions
  • HVAC and hidden pathways considered
  • Contractor-neutral scope
  • Independent verification after cleanup

Remediation Estimate

The assessment supports a proposal for work.

  • Investigation time may be limited
  • Testing may not be available or well matched
  • Each company may define a different scope
  • HVAC may be outside the contractor’s service
  • Completion may be self-evaluated

Testing is central—but never blind

Many assessments include air, surface or dust testing because investigation alone can leave important questions unanswered. Rob explains what each sample is intended to establish and interprets the result in the context of the building.

Find the Whole Problem First

Do not let unanswered questions become repeat work.

Send Rob the water history, visible concerns, prior testing and contractor proposals. He will determine what investigation and testing are needed before the scope is defined.

Call Tell Rob What's Happening